WP3 IP Platform
The objective of Work Package 3 is to act as IP factory to build up necessary hard (fixed technology node) and soft (re-targetable digital designs) sub-components (IP) for the requirements of the designed components in Work Package 4. It clusters all of the soft and hard IP/PHY design activities to leverage synergies between partners, which are working towards providing generic or dedicated and self-contained ââ¬ÅLegoââ¬Â building blocks. At project level the common system requirements are analyzed at demonstrator level (WP5) and broken down into component requirements in WP4. Therefore, WP3 focuses on the circuit design, verification, manufacturing and validation effort to generate from the ground up the necessary advanced IPs in various FD-SOI technology flavors (28nm, 22FDX, 12FDX) in order to enable realization of key features implemented into the components (SoCs and High End Microcontroller) in WP4.This work package is divided into 5 tasks:
- Task 3.1: High-Performance Computing & Vision Signal Processing
- Task 3.2: Power Management, Efficiency, and Optimization
- Task 3.3: Analog and Mixed-Signal
- Task 3.4: Transceiver Building Blocks
- Task 3.5: Design Methodology and Automation
Lead FhG-EMFT
Involved Partners :